Re: [release] Sulfur code freeze
Robert Varga
On 07/03/2022 17:00, Daniel de la Rosa wrote:
Hello TSC and allFrom MRI perspective, we are ... 5? ... months behind the schedule. The good news is that MDSAL-696, which was blocking yangtools-8 -> mdsal-9 integration is done and dusted. Next steps are to integrate with: - controller-5 (done unless maven-verify finds something) - aaa-0.15 (should be a breeze) - netconf-3 (not trivial, but the pieces should be mostly there) - bgpcep-0.17 (not sure, if we pass this we should be okay overall) As it stands, I expect the MRI projects to be ready to integrate on Friday the 11th, with bgpcep-0.17 integration gating yangtools-8 release. Regards, Robert Daniel de la Rosa
|
|
Sulfur code freeze
Hello TSC and all We are going to code freeze Sulfur for all Managed Projects ( cut and lock release branches ) on Monday March 14th at 10 am UTC Please remember that we only allow blocker bug fixes in release branch after code freezes Daniel de la Rosa ODL Release Manager Thanks ps. Release schedule and checklist for your reference https://wiki.opendaylight.org/display/ODL/Sulfur+GA+Release+Checklist https://docs.opendaylight.org/en/latest/release-process/release-schedule.html Daniel de la Rosa ODL Release Manager
|
|
Re: int/test committer promotion
Luis Gomez
https://git.opendaylight.org/gerrit/c/integration/test/+/99972/1/INFO.yaml
toggle quoted messageShow quoted text
btw I am sending a separated mail to cleanup int/test committer list. BR/Luis
|
|
Re: [E] Re: [OpenDaylight TSC] int/test committer promotion
Luis Gomez
Congratulations both int/test new committers.
toggle quoted messageShow quoted text
(I could not make the TSC call yesterday due to a last minute issue). BR/Luis
|
|
Re: [E] Re: [OpenDaylight TSC] int/test committer promotion
Ghazisaidi, Navid
congrats to both of you!
On Fri, Mar 4, 2022 at 4:25 AM Anil Belur <abelur@...> wrote:
|
|
Re: int/test committer promotion
Anil Belur
+1, congrats Tomas and Sangwook.
On Fri, Mar 4, 2022 at 11:23 AM Luis Gomez <ecelgp@...> wrote:
|
|
Re: int/test committer promotion
Robert Varga
On 04/03/2022 08:22, Venkatrangan Govindarajan wrote:
Hi Luis,Congrats as well. Actually no ticket is needed -- just update this file: https://github.com/opendaylight/integration-test/blob/master/INFO.yaml and the rights should become effective pretty much immediately (though may require relogin into gerrit). Regards, Robert
|
|
Re: int/test committer promotion
Venkatrangan Govindarajan
Hi Luis, TSC has approved the promotion. @Ha, Sangwook, @Tomáš Cére Congratulations!!, Please raise the ticket for getting the access to the projects in gerrit. Regards, Rangan(gvrangan) வெள்., 4 மார்., 2022, முற்பகல் 6:53 அன்று, Luis Gomez <ecelgp@...> எழுதியது:
--
Venkatrangan Govindarajan ( When there is no wind...Row )
|
|
int/test committer promotion
Luis Gomez
Hi TSC colleagues,
Can we pass a vote today to have Sangwook and Tomas (in cc) promoted to int/test committers? As you can see below, they both have sufficient contribution and a majority (and the totality) of active int/test committers support the promotion. Thanks Luis
|
|
OpenDaylight 2022 TSC Election Nomination period is open
Casey Cain
Hello everyone, The election and nomination process is for those individuals who have committer rights on one or more OpenDaylight Projects and Active Community Members (ACM). All OpenDaylight Committers and ACMs can nominate themselves, run for election, and vote in the election for the Committer-At-Large seats on the TSC.
Details on the election process may be found here. Dates to RememberNomination Period: 04 Mar 2022 to 17 Mar 2022 How to participate Members who are interested in joining the TSC must self-nominate before the nomination period closes here: https://wiki.opendaylight.org/x/Zl0EAQ Best, Casey Cain Senior Technical Community Architect Linux Foundation _________________ WeChat: okaru6 WhatsApp: +1.503.779.4519
|
|
Re: ODL Urgent Maintenance
Vanessa Valderrama
Maintenance is complete. If you have any issues please open a ticket at support.linuxfoundation.org.
toggle quoted messageShow quoted text
Thank you, Vanessa
On 3/3/22 1:40 PM, Vanessa Valderrama wrote:
What: Ingress, Nexus, Jenkins sandbox and production maintenance
|
|
ODL Urgent Maintenance
Vanessa Valderrama
What: Ingress, Nexus, Jenkins sandbox and production maintenance
When: Now Why: The Hypervisor on these servers has a failing NIC which is resulting in dropped packets. We are migrating the systems before the issue worsens Impact: Each system will be down for approximately 15 minutes Jenkins is being placed in shutdown mode. Maintenance will start when jobs complete Thank you, Vanessa
|
|
TSC Meeting for March 3, 2022 at 10 pm Pacific
Guillaume Lambert
Hello OpenDaylight Community,
The next TSC meeting is March 3, 2022 at 10 pm Pacific Time.
As usual, the agenda proposal and the connection details for this meeting
are available in the wiki
at the following URL:
https://wiki.opendaylight.org/x/bVsEAQ
If you need to add anything, please let me know or add it there.
The meeting minutes will be at the same location after the meeting is
over.
Best Regards
Guillaume
_________________________________________________________________________________________________________________________ Ce message et ses pieces jointes peuvent contenir des informations confidentielles ou privilegiees et ne doivent donc pas etre diffuses, exploites ou copies sans autorisation. Si vous avez recu ce message par erreur, veuillez le signaler a l'expediteur et le detruire ainsi que les pieces jointes. Les messages electroniques etant susceptibles d'alteration, Orange decline toute responsabilite si ce message a ete altere, deforme ou falsifie. Merci. This message and its attachments may contain confidential or privileged information that may be protected by law; they should not be distributed, used or copied without authorisation. If you have received this email in error, please notify the sender and delete this message and its attachments. As emails may be altered, Orange is not liable for messages that have been modified, changed or falsified. Thank you.
|
|
Re: [integration-dev] [opendaylight-dev][release] OpenDaylight - Phosphorus SR2
Thanks Luis. Guillaume, could you please update release notes and downloads for Phosphorous SR2
On Sun, Feb 27, 2022 at 10:22 PM Luis Gomez <ecelgp@...> wrote:
|
|
Re: [integration-dev] [opendaylight-dev][release] OpenDaylight - Phosphorus SR2
Luis Gomez
OK, the distribution has been released here: BR/Luis
|
|
Re: [integration-dev] [opendaylight-dev][release] OpenDaylight - Phosphorus SR2
Thanks Giles. Luis you can proceed with the distribution. Thank you all
On Mon, Feb 21, 2022 at 2:46 AM <gilles.thouenon@...> wrote:
--
Daniel de la Rosa ODL Release Manager
|
|
TSC Meeting for February 24, 2022 at 9 am Pacific
Guillaume Lambert
Hello OpenDaylight Community,
The next TSC meeting is February 24, 2022 at 9 am Pacific Time.
As usual, the agenda proposal and the connection details for this meeting are available in the wiki
at the following URL:
If you need to add anything, please let me know or add it there.
The meeting minutes will be at the same location after the meeting is over.
Best Regards
Guillaume
_________________________________________________________________________________________________________________________ Ce message et ses pieces jointes peuvent contenir des informations confidentielles ou privilegiees et ne doivent donc pas etre diffuses, exploites ou copies sans autorisation. Si vous avez recu ce message par erreur, veuillez le signaler a l'expediteur et le detruire ainsi que les pieces jointes. Les messages electroniques etant susceptibles d'alteration, Orange decline toute responsabilite si ce message a ete altere, deforme ou falsifie. Merci. This message and its attachments may contain confidential or privileged information that may be protected by law; they should not be distributed, used or copied without authorisation. If you have received this email in error, please notify the sender and delete this message and its attachments. As emails may be altered, Orange is not liable for messages that have been modified, changed or falsified. Thank you.
|
|
Re: [integration-dev] [opendaylight-dev][release] OpenDaylight - Phosphorus SR2
Gilles Thouenon
Hello,
I’ve released TransportPCE for P-SR2 (tag 4.2.0). It looks OK on our side.
I’ve also just pushed the TransportPCE release note update.
Please tell us if something is missing.
Regards, Gilles Thouenon
De : integration-dev@... <integration-dev@...>
De la part de Anil Belur
Hello All,
The 'stable/phosphorus' branch is still locked since Robert is working on the MRI updates (IT-23623).
_________________________________________________________________________________________________________________________ Ce message et ses pieces jointes peuvent contenir des informations confidentielles ou privilegiees et ne doivent donc pas etre diffuses, exploites ou copies sans autorisation. Si vous avez recu ce message par erreur, veuillez le signaler a l'expediteur et le detruire ainsi que les pieces jointes. Les messages electroniques etant susceptibles d'alteration, Orange decline toute responsabilite si ce message a ete altere, deforme ou falsifie. Merci. This message and its attachments may contain confidential or privileged information that may be protected by law; they should not be distributed, used or copied without authorisation. If you have received this email in error, please notify the sender and delete this message and its attachments. As emails may be altered, Orange is not liable for messages that have been modified, changed or falsified. Thank you.
|
|
[opendaylight-dev][release] OpenDaylight - Phosphorus SR2
Anil Belur
Hello All, OpenDaylight Phosphorus SR2 version bump is complete and the staging repository has been promoted. The 'stable/phosphorus' branch is still locked since Robert is working on the MRI updates (IT-23623). Pending activities required to be complete for the release: 1. Self-managed projects to release artifacts. 2. Release Distribution once step 1. is complete. 3. Release notes CR needs a review. (https://git.opendaylight.org/gerrit/c/docs/+/99793) 4. Update ODL downloads page [1.]. Thanks to everyone who contributed to the Phosphorus SR2 release. Regards, Anil Belur [0.] https://docs.opendaylight.org/en/latest/downloads.html [1.] https://wiki.opendaylight.org/display/ODL/Phosphorus+SR2+Release+Approval
|
|
TSC approval of Phosphorus SR2
Hello TSC Please approve AR #360 as RC for Phosphorus SR2 as soon as possible Thanks Daniel de la Rosa ODL Release Manager
|
|