TSC status for the week of 12.02.2013
David Meyer <dmm@...>
Board,
The TSC met on 12.05.2013. As might be expected, the bulk of the meeting was concerned with the delay in the Hydrogen release schedule. There was a vigorous discussion which included several vocal (non-TSC) members of the community. One modification we made to the staggered release plan discussed with the Board is to add a "drop-dead date" (DDD) at which we will release without OpenFlow 1.3 support (i.e., with OpenFlow 1.0 only; this reflects many of our constituent's reduced confidence given continued slippage in dates for the OF 1.3 plug in). We will engineer the DDD by working backwards from the Summit dates. More detail on this will be forthcoming. Note that as expected, there has been already been some analyst coverage of the delay. See e.g., [0]. As an aside, we are trying to limit the scope of the OF 1.3 plugin to get it out. In particular, since every switch has idiosyncratic OF behavior, the plugin requires coding for each switch; limiting the number of switches we initially support (as well as the actions/instructions initially supported) should help time to completion. One final note regarding the inability to run OpenDove, VTN and the Affinity project simultaneously in the Virtualization Edition. Madhu (RedHat) has come up with a quite nice method to enable one and disable the other two from the command line (actually somewhat of a configuration time option, but still workable and nicely done). Thanks/kudos to Madhu for this fine work. Finally, I want to point out that the ODP community has really pulled together and made what can only be called heroic efforts to get the release(s) done on time. We all thank them for their fine work on ODP. As always, please let me know if you have questions and/or comments. Thanks, --dmm [0] http://www.sdncentral.com/news/opendaylight-delays-hydrogen-launch/2013/12/ |
|