Re: [OpenDaylight TSC] [OpenDaylight][TSC][release] Fluorine SR3 status 13/06 - RC2 candidate sign off
Robert Varga
On 17/06/2019 18:32, Jamo Luhrsen wrote:
- releasing odlparent-3.1.8
- creating version bump patches for all projects
- releasing yangtools-2.0.21
- creating version bump patches for all projects
- merging both sets of patches
- spinning autorelease
steps in...
Regards,
Robert
AFAICT, this requires:This is probably related to BC 1.61, quoting 1.62 release notes:is this a cumbersome process for us? Like we've decided before with
A performance issue with RSA key pair generation that was introduced in
1.61 has been mostly eliminated.
I am not sure it's worth re-spinning the whole thing, though...
Fluorine
SR3, since it's the last release for Fluorine maybe we take the time to
make sure
we get it as polished as possible.
- releasing odlparent-3.1.8
- creating version bump patches for all projects
- releasing yangtools-2.0.21
- creating version bump patches for all projects
- merging both sets of patches
- spinning autorelease
The CSIT jobs to vet afterward are a smaller set than in previousRight, but I don't have the cycles to drive this, so unless someone else
releases so
it's really only hopefully another 2-3 days to get it done once we have
the BC
upgrade.
steps in...
Regards,
Robert