Rafat Jahan <rafat.jahan@...>
Dear All,
sdninterfaceapp project would like be
a part of offset 1 Lithium release since our dependencies are only on controller
and yang tools.
We have created a project release plan
accordingly.https://wiki.opendaylight.org/view/ODL-SDNi_App:Lithium_Release_Plan
Please let me know if there is anything
else we need to do for sdninterfaceapp to be a part of Lithium Release.
We are going through the link: https://wiki.opendaylight.org/view/Simultaneous_Release:Lithium_Release_Plan
During the Lithium code sprint we plan
to complete the Phase 2 of Project scope which will be Quality Of Service
Data. There will be some major structure refactoring, to reduce complexity
and improve readability of the code. The RestAPI developed will undergo
design change to make the API more robust in the data identification. The
bugs identified in Helium will be updated with Lithium Release since they
may require major anticipated code change.
Looking forward to your support and
guidance.
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________
=====-----=====-----=====
Notice: The information contained in this e-mail
message and/or attachments to it may contain
confidential or privileged information. If you are
not the intended recipient, any dissemination, use,
review, distribution, printing or copying of the
information contained in this e-mail message
and/or attachments to it are strictly prohibited. If
you have received this communication in error,
please notify us by reply e-mail or telephone and
immediately and permanently delete the message
and any attachments. Thank you
|
|

George Zhao
Hi Rafat,
While you are on it, could you please provide the following information as well:
Test Contact (email/IRC)
Project Contact(email/IRC)
You may need to provide project lead (email/irc) once your project elect one in the future.
Thanks,
George
toggle quoted message
Show quoted text
From: Rafat Jahan [mailto:rafat.jahan@...]
Sent: Monday, November 24, 2014 11:12 PM
To: project-proposals@...
Cc: Colin Dixon; George Zhao
Subject: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Dear All,
sdninterfaceapp project would like be a part of offset 1 Lithium release since our dependencies are only on controller and yang tools.
We have created a project release plan accordingly.https://wiki.opendaylight.org/view/ODL-SDNi_App:Lithium_Release_Plan
Please let me know if there is anything else we need to do for sdninterfaceapp to be a part of Lithium Release. We are going through the link: https://wiki.opendaylight.org/view/Simultaneous_Release:Lithium_Release_Plan
During the Lithium code sprint we plan to complete the Phase 2 of Project scope which will be Quality Of Service Data. There will be some major structure refactoring, to reduce complexity and improve
readability of the code. The RestAPI developed will undergo design change to make the API more robust in the data identification. The bugs identified in Helium will be updated with Lithium Release since they may require major anticipated code change.
Looking forward to your support and guidance.
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________
=====-----=====-----=====
Notice: The information contained in this e-mail
message and/or attachments to it may contain
confidential or privileged information. If you are
not the intended recipient, any dissemination, use,
review, distribution, printing or copying of the
information contained in this e-mail message
and/or attachments to it are strictly prohibited. If
you have received this communication in error,
please notify us by reply e-mail or telephone and
immediately and permanently delete the message
and any attachments. Thank you
|
|
Rafat Jahan <rafat.jahan@...>
Hi George,
Please find the contacts below.I will
update this in the Release plan also.
Test Contact (email/IRC):
Sushma Chakilela (sushma.chakilela@...)
Project Contact(email/IRC):
Kiran Kotaru (kotaru.kiran@...)
We need a small clarification on Project
Lead selection.Please correct me if I have misunderstood.
As per my understanding, the Project
Lead will be elected and will be one from our end.For Helium, there was
only one committer from our project which will increase for Lithium releases.
Does that mean the Project Lead can be any one of the two ?
Thanks in advance.
Best Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________
From:
George Zhao <George.Y.Zhao@...>
To:
Rafat Jahan <rafat.jahan@...>,
"project-proposals@..." <project-proposals@...>
Cc:
Colin Dixon <colin@...>
Date:
11/26/2014 07:49 AM
Subject:
RE: sdninterfaceapp(ODL-SDNi)
project proposal for Lithium Release-offset1
Hi Rafat,
While you are on it, could
you please provide the following information as well:
Test Contact (email/IRC)
Project Contact(email/IRC)
You may need to provide project
lead (email/irc) once your project elect one in the future.
Thanks,
George
toggle quoted message
Show quoted text
From: Rafat Jahan [mailto:rafat.jahan@...]
Sent: Monday, November 24, 2014 11:12 PM
To: project-proposals@...
Cc: Colin Dixon; George Zhao
Subject: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Dear All,
sdninterfaceapp project would like be a part of offset 1 Lithium release
since our dependencies are only on controller and yang tools.
We have created a project release plan accordingly.https://wiki.opendaylight.org/view/ODL-SDNi_App:Lithium_Release_Plan
Please let me know if there is anything else we need to do for sdninterfaceapp
to be a part of Lithium Release. We are going through the link: https://wiki.opendaylight.org/view/Simultaneous_Release:Lithium_Release_Plan
During the Lithium code sprint we plan to complete the Phase 2 of Project
scope which will be Quality Of Service Data. There will be some major structure
refactoring, to reduce complexity and improve readability of the code.
The RestAPI developed will undergo design change to make the API more robust
in the data identification. The bugs identified in Helium will be updated
with Lithium Release since they may require major anticipated code change.
Looking forward to your support and guidance.
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________
=====-----=====-----=====
Notice: The information contained in this e-mail
message and/or attachments to it may contain
confidential or privileged information. If you are
not the intended recipient, any dissemination, use,
review, distribution, printing or copying of the
information contained in this e-mail message
and/or attachments to it are strictly prohibited. If
you have received this communication in error,
please notify us by reply e-mail or telephone and
immediately and permanently delete the message
and any attachments. Thank you
|
|
Dana Kutenicsova -X (dkutenic - Pantheon Technologies SRO@Cisco) <dkutenic@...>
Hi,
does this mean that SDNi project will not be using BGPCEP project anymore?
We are claiming to be offset 1, but if the above is true, we switch to offset 2 (which means no project is dependent on us).
Regards,
Dana
toggle quoted message
Show quoted text
From: project-proposals-bounces@... [project-proposals-bounces@...] on behalf of Rafat Jahan [rafat.jahan@...]
Sent: Tuesday, November 25, 2014 8:12 AM
To: project-proposals@...
Subject: [Project-proposals] sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Dear All,
sdninterfaceapp project would like be a part of offset 1 Lithium release since our dependencies are only on controller and yang tools.
We have created a project release plan accordingly.https://wiki.opendaylight.org/view/ODL-SDNi_App:Lithium_Release_Plan
Please let me know if there is anything else we need to do for sdninterfaceapp to be a part of Lithium Release. We are going through the link: https://wiki.opendaylight.org/view/Simultaneous_Release:Lithium_Release_Plan
During the Lithium code sprint we plan to complete the Phase 2 of Project scope which will be Quality Of Service Data. There will be some major structure refactoring, to reduce complexity and improve readability of the code.
The RestAPI developed will undergo design change to make the API more robust in the data identification. The bugs identified in Helium will be updated with Lithium Release since they may require major anticipated code change.
Looking forward to your support and guidance.
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________
=====-----=====-----=====
Notice: The information contained in this e-mail
message and/or attachments to it may contain
confidential or privileged information. If you are
not the intended recipient, any dissemination, use,
review, distribution, printing or copying of the
information contained in this e-mail message
and/or attachments to it are strictly prohibited. If
you have received this communication in error,
please notify us by reply e-mail or telephone and
immediately and permanently delete the message
and any attachments. Thank you
|
|
Rafat Jahan <rafat.jahan@...>
Hi Dana,
We do not see any further dependency
on BGPCEP project as of now.
But will request that BGPCEP remains
as a part of offset 1 release in order to avoid any unforeseen issues.
Thanks and Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________
From:
"Dana Kutenicsova
-X (dkutenic - Pantheon Technologies SRO at Cisco)" <dkutenic@...>
To:
Rafat Jahan <rafat.jahan@...>,
"project-proposals@..." <project-proposals@...>
Cc:
"bgpcep-dev@..."
<bgpcep-dev@...>
Date:
11/26/2014 02:43 PM
Subject:
RE: [Project-proposals]
sdninterfaceapp(ODL-SDNi) project proposal for Lithium
Release-offset1
Hi,
does this mean that SDNi project will not be using BGPCEP project anymore?
We are claiming to be offset 1, but if the above is true, we switch to
offset 2 (which means no project is dependent on us).
Regards,
Dana
toggle quoted message
Show quoted text
From: project-proposals-bounces@...
[project-proposals-bounces@...] on behalf of Rafat Jahan
[rafat.jahan@...]
Sent: Tuesday, November 25, 2014 8:12 AM
To: project-proposals@...
Subject: [Project-proposals] sdninterfaceapp(ODL-SDNi) project proposal
for Lithium Release-offset1
Dear All,
sdninterfaceapp project would like be a part of offset 1 Lithium release
since our dependencies are only on controller and yang tools.
We have created a project release plan accordingly.https://wiki.opendaylight.org/view/ODL-SDNi_App:Lithium_Release_Plan
Please let me know if there is anything else we need to do for sdninterfaceapp
to be a part of Lithium Release. We are going through the link: https://wiki.opendaylight.org/view/Simultaneous_Release:Lithium_Release_Plan
During the Lithium code sprint we plan to complete the Phase 2 of Project
scope which will be Quality Of Service Data. There will be some major structure
refactoring, to reduce complexity and improve readability of the code.
The RestAPI developed will undergo design change to make the API more robust
in the data identification. The bugs identified in Helium will be updated
with Lithium Release since they may require major anticipated code change.
Looking forward to your support and guidance.
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________
=====-----=====-----=====
Notice: The information contained in this e-mail
message and/or attachments to it may contain
confidential or privileged information. If you are
not the intended recipient, any dissemination, use,
review, distribution, printing or copying of the
information contained in this e-mail message
and/or attachments to it are strictly prohibited. If
you have received this communication in error,
please notify us by reply e-mail or telephone and
immediately and permanently delete the message
and any attachments. Thank you
|
|

George Zhao
Thanks Rafat,
Yes, project lead role is selected by vote from committers in the project. If your project only have one committer, then he/she will automatically be in the
project lead role. We only need that in M1 milestone not immediately.
George
toggle quoted message
Show quoted text
From: Rafat Jahan [mailto:rafat.jahan@...]
Sent: Tuesday, November 25, 2014 8:59 PM
To: George Zhao
Cc: Colin Dixon; project-proposals@...
Subject: RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Hi George,
Please find the contacts below.I will update this in the Release plan also.
Test Contact (email/IRC): Sushma Chakilela (sushma.chakilela@...)
Project Contact(email/IRC): Kiran Kotaru (kotaru.kiran@...)
We need a small clarification on Project Lead selection.Please correct me if I have misunderstood.
As per my understanding, the Project Lead will be elected and will be one from our end.For Helium, there was only one committer from our project which will increase for Lithium releases. Does that
mean the Project Lead can be any one of the two ?
Thanks in advance.
Best Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________
From: George Zhao <George.Y.Zhao@...>
To: Rafat Jahan <rafat.jahan@...>, "project-proposals@..." <project-proposals@...>
Cc: Colin Dixon <colin@...>
Date: 11/26/2014 07:49 AM
Subject: RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Hi Rafat,
While you are on it, could you please provide the following information as well:
Test Contact (email/IRC)
Project Contact(email/IRC)
You may need to provide project lead (email/irc) once your project elect one in the future.
Thanks,
George
From: Rafat Jahan [mailto:rafat.jahan@...]
Sent: Monday, November 24, 2014 11:12 PM
To: project-proposals@...
Cc: Colin Dixon; George Zhao
Subject: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Dear All,
sdninterfaceapp project would like be a part of offset 1 Lithium release since our dependencies are only on controller and yang tools.
We have created a project release plan accordingly.https://wiki.opendaylight.org/view/ODL-SDNi_App:Lithium_Release_Plan
Please let me know if there is anything else we need to do for sdninterfaceapp to be a part of Lithium Release. We are going through the link: https://wiki.opendaylight.org/view/Simultaneous_Release:Lithium_Release_Plan
During the Lithium code sprint we plan to complete the Phase 2 of Project scope which will be Quality Of Service Data. There will be some major structure refactoring, to reduce complexity and improve readability of the code. The RestAPI developed will undergo
design change to make the API more robust in the data identification. The bugs identified in Helium will be updated with Lithium Release since they may require major anticipated code change.
Looking forward to your support and guidance.
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________
=====-----=====-----=====
Notice: The information contained in this e-mail
message and/or attachments to it may contain
confidential or privileged information. If you are
not the intended recipient, any dissemination, use,
review, distribution, printing or copying of the
information contained in this e-mail message
and/or attachments to it are strictly prohibited. If
you have received this communication in error,
please notify us by reply e-mail or telephone and
immediately and permanently delete the message
and any attachments. Thank you
|
|
Rafat Jahan <rafat.jahan@...>
Hi,
Can we get a spot on the TSC agenda
on December 18th for the presentation and release review of sdninterfaceapp(ODL-SDNi)
project.
Thanks and Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________
From:
George Zhao <George.Y.Zhao@...>
To:
Rafat Jahan <rafat.jahan@...>
Cc:
Colin Dixon <colin@...>,
"project-proposals@..." <project-proposals@...>
Date:
11/27/2014 06:03 AM
Subject:
RE: sdninterfaceapp(ODL-SDNi)
project proposal for Lithium Release-offset1
Thanks Rafat,
Yes, project lead role is
selected by vote from committers in the project. If your project
only have one committer, then he/she will automatically be in the project
lead role. We only need that in M1 milestone not immediately.
George
toggle quoted message
Show quoted text
From: Rafat Jahan [mailto:rafat.jahan@...]
Sent: Tuesday, November 25, 2014 8:59 PM
To: George Zhao
Cc: Colin Dixon; project-proposals@...
Subject: RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium
Release-offset1
Hi George,
Please find the contacts below.I will update this in the Release plan also.
Test Contact (email/IRC): Sushma Chakilela (sushma.chakilela@...)
Project Contact(email/IRC): Kiran Kotaru
(kotaru.kiran@...)
We need a small clarification on Project Lead selection.Please correct
me if I have misunderstood.
As per my understanding, the Project Lead will be elected and will be one
from our end.For Helium, there was only one committer from our project
which will increase for Lithium releases. Does that mean the Project Lead
can be any one of the two ?
Thanks in advance.
Best Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________
From: George
Zhao <George.Y.Zhao@...>
To: Rafat Jahan
<rafat.jahan@...>, "project-proposals@..."
<project-proposals@...>
Cc: Colin Dixon
<colin@...>
Date: 11/26/2014
07:49 AM
Subject: RE:
sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Hi Rafat,
While you are on it, could you please provide the following information
as well:
Test Contact (email/IRC)
Project Contact(email/IRC)
You may need to provide project lead (email/irc) once your project elect
one in the future.
Thanks,
George
From: Rafat Jahan [mailto:rafat.jahan@...]
Sent: Monday, November 24, 2014 11:12 PM
To: project-proposals@...
Cc: Colin Dixon; George Zhao
Subject: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Dear All,
sdninterfaceapp project would like be a part of offset 1 Lithium release
since our dependencies are only on controller and yang tools.
We have created a project release plan accordingly.https://wiki.opendaylight.org/view/ODL-SDNi_App:Lithium_Release_Plan
Please let me know if there is anything else we need to do for sdninterfaceapp
to be a part of Lithium Release. We are going through the link: https://wiki.opendaylight.org/view/Simultaneous_Release:Lithium_Release_Plan
During the Lithium code sprint we plan to complete the Phase 2 of Project
scope which will be Quality Of Service Data. There will be some major structure
refactoring, to reduce complexity and improve readability of the code.
The RestAPI developed will undergo design change to make the API more robust
in the data identification. The bugs identified in Helium will be updated
with Lithium Release since they may require major anticipated code change.
Looking forward to your support and guidance.
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________
=====-----=====-----=====
Notice: The information contained in this e-mail
message and/or attachments to it may contain
confidential or privileged information. If you are
not the intended recipient, any dissemination, use,
review, distribution, printing or copying of the
information contained in this e-mail message
and/or attachments to it are strictly prohibited. If
you have received this communication in error,
please notify us by reply e-mail or telephone and
immediately and permanently delete the message
and any attachments. Thank you
|
|

George Zhao
SDNi is an existing project.
Please verify with Colin, I thought existing projects should submit to release mailing list instead of proposal to indicate intention to participate Lithium
SR with M1 information:
1)
Offset
2)
Project Lead, Project Contact, Test Contact
3)
Published release plan
Thanks,
George
toggle quoted message
Show quoted text
From: Rafat Jahan [mailto:rafat.jahan@...]
Sent: Monday, December 08, 2014 12:32 PM
To: George Zhao
Cc: Colin Dixon; project-proposals@...
Subject: RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Hi,
Can we get a spot on the TSC agenda on December 18th for the presentation and release review of sdninterfaceapp(ODL-SDNi) project.
Thanks and Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________
From: George Zhao <George.Y.Zhao@...>
To: Rafat Jahan <rafat.jahan@...>
Cc: Colin Dixon <colin@...>, "project-proposals@..." <project-proposals@...>
Date: 11/27/2014 06:03 AM
Subject: RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Thanks Rafat,
Yes, project lead role is selected by vote from committers in the project. If your project only have one committer, then he/she will automatically be in the project lead role.
We only need that in M1 milestone not immediately.
George
From: Rafat Jahan [mailto:rafat.jahan@...]
Sent: Tuesday, November 25, 2014 8:59 PM
To: George Zhao
Cc: Colin Dixon; project-proposals@...
Subject: RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Hi George,
Please find the contacts below.I will update this in the Release plan also.
Test Contact (email/IRC): Sushma Chakilela (sushma.chakilela@...)
Project Contact(email/IRC): Kiran Kotaru (kotaru.kiran@...)
We need a small clarification on Project Lead selection.Please correct me if I have misunderstood.
As per my understanding, the Project Lead will be elected and will be one from our end.For Helium, there was only one committer from our project which will increase for Lithium releases. Does that mean the Project Lead can be any one of the two ?
Thanks in advance.
Best Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________
From: George Zhao <George.Y.Zhao@...>
To: Rafat Jahan <rafat.jahan@...>, "project-proposals@..." <project-proposals@...>
Cc: Colin Dixon <colin@...>
Date: 11/26/2014 07:49 AM
Subject: RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Hi Rafat,
While you are on it, could you please provide the following information as well:
Test Contact (email/IRC)
Project Contact(email/IRC)
You may need to provide project lead (email/irc) once your project elect one in the future.
Thanks,
George
From: Rafat Jahan [mailto:rafat.jahan@...]
Sent: Monday, November 24, 2014 11:12 PM
To: project-proposals@...
Cc: Colin Dixon; George Zhao
Subject: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Dear All,
sdninterfaceapp project would like be a part of offset 1 Lithium release since our dependencies are only on controller and yang tools.
We have created a project release plan accordingly.https://wiki.opendaylight.org/view/ODL-SDNi_App:Lithium_Release_Plan
Please let me know if there is anything else we need to do for sdninterfaceapp to be a part of Lithium Release. We are going through the link: https://wiki.opendaylight.org/view/Simultaneous_Release:Lithium_Release_Plan
During the Lithium code sprint we plan to complete the Phase 2 of Project scope which will be Quality Of Service Data. There will be some major structure refactoring, to reduce complexity and improve readability of the code. The RestAPI developed will undergo
design change to make the API more robust in the data identification. The bugs identified in Helium will be updated with Lithium Release since they may require major anticipated code change.
Looking forward to your support and guidance.
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________
=====-----=====-----=====
Notice: The information contained in this e-mail
message and/or attachments to it may contain
confidential or privileged information. If you are
not the intended recipient, any dissemination, use,
review, distribution, printing or copying of the
information contained in this e-mail message
and/or attachments to it are strictly prohibited. If
you have received this communication in error,
please notify us by reply e-mail or telephone and
immediately and permanently delete the message
and any attachments. Thank you
|
|
George is right. Existing projects should e-mail the release list ( release@...) with the George listed. Existing projects DO NOT need to have another creation review to participate. --Colin
toggle quoted message
Show quoted text
On Mon, Dec 8, 2014 at 3:27 PM, George Zhao <George.Y.Zhao@...> wrote:
SDNi is an existing project.
Please verify with Colin, I thought existing projects should submit to release mailing list instead of proposal to indicate intention to participate Lithium
SR with M1 information:
1)
Offset
2)
Project Lead, Project Contact, Test Contact
3)
Published release plan
Thanks,
George
From: Rafat Jahan [mailto:rafat.jahan@...]
Sent: Monday, December 08, 2014 12:32 PM
To: George Zhao
Cc: Colin Dixon; project-proposals@...
Subject: RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Hi,
Can we get a spot on the TSC agenda on December 18th for the presentation and release review of sdninterfaceapp(ODL-SDNi) project.
Thanks and Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________
From: George Zhao <George.Y.Zhao@...>
To: Rafat Jahan <rafat.jahan@...>
Cc: Colin Dixon <colin@...>, "project-proposals@..." <project-proposals@...>
Date: 11/27/2014 06:03 AM
Subject: RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Thanks Rafat,
Yes, project lead role is selected by vote from committers in the project. If your project only have one committer, then he/she will automatically be in the project lead role.
We only need that in M1 milestone not immediately.
George
From: Rafat Jahan [mailto:rafat.jahan@...]
Sent: Tuesday, November 25, 2014 8:59 PM
To: George Zhao
Cc: Colin Dixon; project-proposals@...
Subject: RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Hi George,
Please find the contacts below.I will update this in the Release plan also.
Test Contact (email/IRC): Sushma Chakilela (sushma.chakilela@...)
Project Contact(email/IRC): Kiran Kotaru (kotaru.kiran@...)
We need a small clarification on Project Lead selection.Please correct me if I have misunderstood.
As per my understanding, the Project Lead will be elected and will be one from our end.For Helium, there was only one committer from our project which will increase for Lithium releases. Does that mean the Project Lead can be any one of the two ?
Thanks in advance.
Best Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________
From: George Zhao <George.Y.Zhao@...>
To: Rafat Jahan <rafat.jahan@...>, "project-proposals@..." <project-proposals@...>
Cc: Colin Dixon <colin@...>
Date: 11/26/2014 07:49 AM
Subject: RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Hi Rafat,
While you are on it, could you please provide the following information as well:
Test Contact (email/IRC)
Project Contact(email/IRC)
You may need to provide project lead (email/irc) once your project elect one in the future.
Thanks,
George
From: Rafat Jahan [mailto:rafat.jahan@...]
Sent: Monday, November 24, 2014 11:12 PM
To: project-proposals@...
Cc: Colin Dixon; George Zhao
Subject: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Dear All,
sdninterfaceapp project would like be a part of offset 1 Lithium release since our dependencies are only on controller and yang tools.
We have created a project release plan accordingly.https://wiki.opendaylight.org/view/ODL-SDNi_App:Lithium_Release_Plan
Please let me know if there is anything else we need to do for sdninterfaceapp to be a part of Lithium Release. We are going through the link: https://wiki.opendaylight.org/view/Simultaneous_Release:Lithium_Release_Plan
During the Lithium code sprint we plan to complete the Phase 2 of Project scope which will be Quality Of Service Data. There will be some major structure refactoring, to reduce complexity and improve readability of the code. The RestAPI developed will undergo
design change to make the API more robust in the data identification. The bugs identified in Helium will be updated with Lithium Release since they may require major anticipated code change.
Looking forward to your support and guidance.
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________
=====-----=====-----=====
Notice: The information contained in this e-mail
message and/or attachments to it may contain
confidential or privileged information. If you are
not the intended recipient, any dissemination, use,
review, distribution, printing or copying of the
information contained in this e-mail message
and/or attachments to it are strictly prohibited. If
you have received this communication in error,
please notify us by reply e-mail or telephone and
immediately and permanently delete the message
and any attachments. Thank you
|
|
Rafat Jahan <rafat.jahan@...>
Hi George/Colin, Thank you for the information. Will do as mentioned. Best Regards, Rafat Jahan Tata Consultancy Services Cell:- 9886420332 Mailto: rafat.jahan@... Website: http://www.tcs.com____________________________________________ Experience certainty. IT Services Business Solutions Consulting ____________________________________________ -----Colin Dixon <colin@...> wrote: ----- ======================= To: George Zhao <George.Y.Zhao@...> From: Colin Dixon <colin@...> Date: 12/10/2014 09:37AM Cc: Rafat Jahan <rafat.jahan@...>, "project-proposals@..." <project-proposals@...> Subject: Re: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1 ======================= George is right. Existing projects should e-mail the release list ( release@...) with the George listed. Existing projects DO NOT need to have another creation review to participate. --Colin On Mon, Dec 8, 2014 at 3:27 PM, George Zhao <George.Y.Zhao@...> wrote: SDNi is an existing project.
Please verify with Colin, I thought existing projects should submit to release mailing list instead of proposal to indicate intention to participate Lithium SR with M1 information:
1) Offset
2) Project Lead, Project Contact, Test Contact
3) Published release plan
Thanks,
George
*From:* Rafat Jahan [mailto:rafat.jahan@...] *Sent:* Monday, December 08, 2014 12:32 PM
*To:* George Zhao *Cc:* Colin Dixon; project-proposals@... *Subject:* RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Hi,
Can we get a spot on the TSC agenda on December 18th for the presentation and release review of sdninterfaceapp(ODL-SDNi) project.
Thanks and Regards, Rafat Jahan Tata Consultancy Services Cell:- 9886420332 Mailto: rafat.jahan@... Website: http://www.tcs.com ____________________________________________ Experience certainty. IT Services Business Solutions Consulting ____________________________________________
From: George Zhao <George.Y.Zhao@...> To: Rafat Jahan <rafat.jahan@...> Cc: Colin Dixon <colin@...>, " project-proposals@..." < project-proposals@...> Date: 11/27/2014 06:03 AM Subject: RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1 ------------------------------
Thanks Rafat,
Yes, project lead role is selected by vote from committers in the project. If your project only have one committer, then he/she will automatically be in the project lead role. We only need that in M1 milestone not immediately.
George
*From:* Rafat Jahan [mailto:rafat.jahan@... <rafat.jahan@...>] * Sent:* Tuesday, November 25, 2014 8:59 PM * To:* George Zhao * Cc:* Colin Dixon; project-proposals@... * Subject:* RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Hi George,
Please find the contacts below.I will update this in the Release plan also.
Test Contact (email/IRC): Sushma Chakilela (sushma.chakilela@...) Project Contact(email/IRC): Kiran Kotaru (kotaru.kiran@...)
We need a small clarification on Project Lead selection.Please correct me if I have misunderstood. As per my understanding, the Project Lead will be elected and will be one from our end.For Helium, there was only one committer from our project which will increase for Lithium releases. Does that mean the Project Lead can be any one of the two ?
Thanks in advance.
Best Regards, Rafat Jahan Tata Consultancy Services Cell:- 9886420332 Mailto: rafat.jahan@... Website: http://www.tcs.com ____________________________________________ Experience certainty. IT Services Business Solutions Consulting ____________________________________________
From: George Zhao <George.Y.Zhao@...> To: Rafat Jahan <rafat.jahan@...>, " project-proposals@..." < project-proposals@...> Cc: Colin Dixon <colin@...> Date: 11/26/2014 07:49 AM Subject: RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1 ------------------------------
Hi Rafat,
While you are on it, could you please provide the following information as well:
Test Contact (email/IRC) Project Contact(email/IRC)
You may need to provide project lead (email/irc) once your project elect one in the future.
Thanks,
George
* From:* Rafat Jahan [mailto:rafat.jahan@... <rafat.jahan@...>] * Sent:* Monday, November 24, 2014 11:12 PM * To:* project-proposals@... * Cc:* Colin Dixon; George Zhao * Subject:* sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Dear All,
sdninterfaceapp project would like be a part of offset 1 Lithium release since our dependencies are only on controller and yang tools. We have created a project release plan accordingly. https://wiki.opendaylight.org/view/ODL-SDNi_App:Lithium_Release_Plan
Please let me know if there is anything else we need to do for sdninterfaceapp to be a part of Lithium Release. We are going through the link: https://wiki.opendaylight.org/view/Simultaneous_Release:Lithium_Release_Plan
During the Lithium code sprint we plan to complete the Phase 2 of Project scope which will be Quality Of Service Data. There will be some major structure refactoring, to reduce complexity and improve readability of the code. The RestAPI developed will undergo design change to make the API more robust in the data identification. The bugs identified in Helium will be updated with Lithium Release since they may require major anticipated code change.
Looking forward to your support and guidance.
Rafat Jahan Tata Consultancy Services Cell:- 9886420332 Mailto: rafat.jahan@... Website: http://www.tcs.com ____________________________________________ Experience certainty. IT Services Business Solutions Consulting ____________________________________________
=====-----=====-----===== Notice: The information contained in this e-mail message and/or attachments to it may contain confidential or privileged information. If you are not the intended recipient, any dissemination, use, review, distribution, printing or copying of the information contained in this e-mail message and/or attachments to it are strictly prohibited. If you have received this communication in error, please notify us by reply e-mail or telephone and immediately and permanently delete the message and any attachments. Thank you
|
|
Rafat Jahan <rafat.jahan@...>
Hi George/Colin, Thank you for the information. Will do as mentioned. Best Regards, Rafat Jahan Tata Consultancy Services Cell:- 9886420332 Mailto: rafat.jahan@... Website: http://www.tcs.com____________________________________________ Experience certainty. IT Services Business Solutions Consulting ____________________________________________ -----Colin Dixon <colin@...> wrote: ----- ======================= To: George Zhao <George.Y.Zhao@...> From: Colin Dixon <colin@...> Date: 12/10/2014 09:37AM Cc: Rafat Jahan <rafat.jahan@...>, "project-proposals@..." <project-proposals@...> Subject: Re: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1 ======================= George is right. Existing projects should e-mail the release list ( release@...) with the George listed. Existing projects DO NOT need to have another creation review to participate. --Colin On Mon, Dec 8, 2014 at 3:27 PM, George Zhao <George.Y.Zhao@...> wrote: SDNi is an existing project.
Please verify with Colin, I thought existing projects should submit to release mailing list instead of proposal to indicate intention to participate Lithium SR with M1 information:
1) Offset
2) Project Lead, Project Contact, Test Contact
3) Published release plan
Thanks,
George
*From:* Rafat Jahan [mailto:rafat.jahan@...] *Sent:* Monday, December 08, 2014 12:32 PM
*To:* George Zhao *Cc:* Colin Dixon; project-proposals@... *Subject:* RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Hi,
Can we get a spot on the TSC agenda on December 18th for the presentation and release review of sdninterfaceapp(ODL-SDNi) project.
Thanks and Regards, Rafat Jahan Tata Consultancy Services Cell:- 9886420332 Mailto: rafat.jahan@... Website: http://www.tcs.com ____________________________________________ Experience certainty. IT Services Business Solutions Consulting ____________________________________________
From: George Zhao <George.Y.Zhao@...> To: Rafat Jahan <rafat.jahan@...> Cc: Colin Dixon <colin@...>, " project-proposals@..." < project-proposals@...> Date: 11/27/2014 06:03 AM Subject: RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1 ------------------------------
Thanks Rafat,
Yes, project lead role is selected by vote from committers in the project. If your project only have one committer, then he/she will automatically be in the project lead role. We only need that in M1 milestone not immediately.
George
*From:* Rafat Jahan [mailto:rafat.jahan@... <rafat.jahan@...>] * Sent:* Tuesday, November 25, 2014 8:59 PM * To:* George Zhao * Cc:* Colin Dixon; project-proposals@... * Subject:* RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Hi George,
Please find the contacts below.I will update this in the Release plan also.
Test Contact (email/IRC): Sushma Chakilela (sushma.chakilela@...) Project Contact(email/IRC): Kiran Kotaru (kotaru.kiran@...)
We need a small clarification on Project Lead selection.Please correct me if I have misunderstood. As per my understanding, the Project Lead will be elected and will be one from our end.For Helium, there was only one committer from our project which will increase for Lithium releases. Does that mean the Project Lead can be any one of the two ?
Thanks in advance.
Best Regards, Rafat Jahan Tata Consultancy Services Cell:- 9886420332 Mailto: rafat.jahan@... Website: http://www.tcs.com ____________________________________________ Experience certainty. IT Services Business Solutions Consulting ____________________________________________
From: George Zhao <George.Y.Zhao@...> To: Rafat Jahan <rafat.jahan@...>, " project-proposals@..." < project-proposals@...> Cc: Colin Dixon <colin@...> Date: 11/26/2014 07:49 AM Subject: RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1 ------------------------------
Hi Rafat,
While you are on it, could you please provide the following information as well:
Test Contact (email/IRC) Project Contact(email/IRC)
You may need to provide project lead (email/irc) once your project elect one in the future.
Thanks,
George
* From:* Rafat Jahan [mailto:rafat.jahan@... <rafat.jahan@...>] * Sent:* Monday, November 24, 2014 11:12 PM * To:* project-proposals@... * Cc:* Colin Dixon; George Zhao * Subject:* sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
Dear All,
sdninterfaceapp project would like be a part of offset 1 Lithium release since our dependencies are only on controller and yang tools. We have created a project release plan accordingly. https://wiki.opendaylight.org/view/ODL-SDNi_App:Lithium_Release_Plan
Please let me know if there is anything else we need to do for sdninterfaceapp to be a part of Lithium Release. We are going through the link: https://wiki.opendaylight.org/view/Simultaneous_Release:Lithium_Release_Plan
During the Lithium code sprint we plan to complete the Phase 2 of Project scope which will be Quality Of Service Data. There will be some major structure refactoring, to reduce complexity and improve readability of the code. The RestAPI developed will undergo design change to make the API more robust in the data identification. The bugs identified in Helium will be updated with Lithium Release since they may require major anticipated code change.
Looking forward to your support and guidance.
Rafat Jahan Tata Consultancy Services Cell:- 9886420332 Mailto: rafat.jahan@... Website: http://www.tcs.com ____________________________________________ Experience certainty. IT Services Business Solutions Consulting ____________________________________________
=====-----=====-----===== Notice: The information contained in this e-mail message and/or attachments to it may contain confidential or privileged information. If you are not the intended recipient, any dissemination, use, review, distribution, printing or copying of the information contained in this e-mail message and/or attachments to it are strictly prohibited. If you have received this communication in error, please notify us by reply e-mail or telephone and immediately and permanently delete the message and any attachments. Thank you
|
|