sdninterfaceapp project would like be a part of offset 1 Lithium release since our dependencies are only on controller and yang tools.
We have created a project release plan accordingly.https://wiki.opendaylight.org/view/ODL-SDNi_App:Lithium_Release_Plan

Please let me know if there is anything else we need to do for sdninterfaceapp to be a part of Lithium Release. We are going through the link:  https://wiki.opendaylight.org/view/Simultaneous_Release:Lithium_Release_Plan

During the Lithium code sprint we plan to complete the Phase 2 of Project scope which will be Quality Of Service Data. There will be some major structure refactoring, to reduce complexity and improve readability of the code. The RestAPI developed will undergo design change to make the API more robust in the data identification. The bugs identified in Helium will be updated with Lithium Release since they may require major anticipated code change.

Looking forward to your support and guidance.

Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website:
http://www.tcs.com
____________________________________________
Experience certainty.        IT Services
                       Business Solutions
                       Consulting
____________________________________________

=====-----=====-----=====
Notice: The information contained in this e-mail
message and/or attachments to it may contain
confidential or privileged information. If you are
not the intended recipient, any dissemination, use,
review, distribution, printing or copying of the
information contained in this e-mail message
and/or attachments to it are strictly prohibited. If
you have received this communication in error,
please notify us by reply e-mail or telephone and
immediately and permanently delete the message
and any attachments. Thank you


George Zhao
 

Hi Rafat,

 

While you are on it, could you please provide the following information as well:

 

Test Contact (email/IRC)

Project Contact(email/IRC)

 

You may need to provide project lead (email/irc) once your project elect one in the future.

 

Thanks,

 

George

 

From: Rafat Jahan [mailto:rafat.jahan@...]
Sent: Monday, November 24, 2014 11:12 PM
To: project-proposals@...
Cc: Colin Dixon; George Zhao
Subject: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1

 

Dear All,

sdninterfaceapp project would like be a part of offset 1 Lithium release since our dependencies are only on controller and yang tools.
We have created a project release plan accordingly.https://wiki.opendaylight.org/view/ODL-SDNi_App:Lithium_Release_Plan

Please let me know if there is anything else we need to do for sdninterfaceapp to be a part of Lithium Release. We are going through the link:  https://wiki.opendaylight.org/view/Simultaneous_Release:Lithium_Release_Plan

During the Lithium code sprint we plan to complete the Phase 2 of Project scope which will be Quality Of Service Data. There will be some major structure refactoring, to reduce complexity and improve readability of the code. The RestAPI developed will undergo design change to make the API more robust in the data identification. The bugs identified in Helium will be updated with Lithium Release since they may require major anticipated code change.

Looking forward to your support and guidance.

Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website:
http://www.tcs.com
____________________________________________
Experience certainty.        IT Services
                       Business Solutions
                       Consulting
____________________________________________

=====-----=====-----=====
Notice: The information contained in this e-mail
message and/or attachments to it may contain
confidential or privileged information. If you are
not the intended recipient, any dissemination, use,
review, distribution, printing or copying of the
information contained in this e-mail message
and/or attachments to it are strictly prohibited. If
you have received this communication in error,
please notify us by reply e-mail or telephone and
immediately and permanently delete the message
and any attachments. Thank you


Rafat Jahan <rafat.jahan@...>
 

Hi George,

Please find the contacts below.I will update this in the Release plan also.

Test Contact (email/IRC): Sushma Chakilela (sushma.chakilela@...)
Project Contact(email/IRC): Kiran Kotaru (kotaru.kiran@...)



We need a small clarification on Project Lead selection.Please correct me if I have misunderstood.
As per my understanding, the Project Lead will be elected and will be one from our end.For Helium, there was only one committer from our project which will increase for Lithium releases. Does that mean the Project Lead can be any one of the two ?

Thanks in advance.

Best Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website:
http://www.tcs.com
____________________________________________
Experience certainty.        IT Services
                       Business Solutions
                       Consulting
____________________________________________




From:        George Zhao <George.Y.Zhao@...>
To:        Rafat Jahan <rafat.jahan@...>, "project-proposals@..." <project-proposals@...>
Cc:        Colin Dixon <colin@...>
Date:        11/26/2014 07:49 AM
Subject:        RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1




Hi Rafat,
 
While you are on it, could you please provide the following information as well:
 
Test Contact (email/IRC)
Project Contact(email/IRC)
 
You may need to provide project lead (email/irc) once your project elect one in the future.
 
Thanks,
 
George
 

From: Rafat Jahan [mailto:rafat.jahan@...]
Sent:
Monday, November 24, 2014 11:12 PM
To:
project-proposals@...
Cc:
Colin Dixon; George Zhao
Subject:
sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1

 
Dear All,

sdninterfaceapp project would like be a part of offset 1 Lithium release since our dependencies are only on controller and yang tools.

We have created a project release plan accordingly.
https://wiki.opendaylight.org/view/ODL-SDNi_App:Lithium_Release_Plan

Please let me know if there is anything else we need to do for sdninterfaceapp to be a part of Lithium Release. We are going through the link:  
https://wiki.opendaylight.org/view/Simultaneous_Release:Lithium_Release_Plan

During the Lithium code sprint we plan to complete the Phase 2 of Project scope which will be Quality Of Service Data. There will be some major structure refactoring, to reduce complexity and improve readability of the code. The RestAPI developed will undergo design change to make the API more robust in the data identification. The bugs identified in Helium will be updated with Lithium Release since they may require major anticipated code change.


Looking forward to your support and guidance.


Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website:
http://www.tcs.com
____________________________________________
Experience certainty.        IT Services
                      Business Solutions
                      Consulting
____________________________________________

=====-----=====-----=====
Notice: The information contained in this e-mail
message and/or attachments to it may contain
confidential or privileged information. If you are
not the intended recipient, any dissemination, use,
review, distribution, printing or copying of the
information contained in this e-mail message
and/or attachments to it are strictly prohibited. If
you have received this communication in error,
please notify us by reply e-mail or telephone and
immediately and permanently delete the message
and any attachments. Thank you


Dana Kutenicsova -X (dkutenic - Pantheon Technologies SRO@Cisco) <dkutenic@...>
 

Hi,
does this mean that SDNi project will not be using BGPCEP project anymore?
We are claiming to be offset 1, but if the above is true, we switch to offset 2 (which means no project is dependent on us).
Regards,
Dana


From: project-proposals-bounces@... [project-proposals-bounces@...] on behalf of Rafat Jahan [rafat.jahan@...]
Sent: Tuesday, November 25, 2014 8:12 AM
To: project-proposals@...
Subject: [Project-proposals] sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1

Dear All,

sdninterfaceapp project would like be a part of offset 1 Lithium release since our dependencies are only on controller and yang tools.
We have created a project release plan accordingly.https://wiki.opendaylight.org/view/ODL-SDNi_App:Lithium_Release_Plan

Please let me know if there is anything else we need to do for sdninterfaceapp to be a part of Lithium Release. We are going through the link:  https://wiki.opendaylight.org/view/Simultaneous_Release:Lithium_Release_Plan

During the Lithium code sprint we plan to complete the Phase 2 of Project scope which will be Quality Of Service Data. There will be some major structure refactoring, to reduce complexity and improve readability of the code. The RestAPI developed will undergo design change to make the API more robust in the data identification. The bugs identified in Helium will be updated with Lithium Release since they may require major anticipated code change.

Looking forward to your support and guidance.

Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website:
http://www.tcs.com
____________________________________________
Experience certainty.        IT Services
                       Business Solutions
                       Consulting
____________________________________________

=====-----=====-----=====
Notice: The information contained in this e-mail
message and/or attachments to it may contain
confidential or privileged information. If you are
not the intended recipient, any dissemination, use,
review, distribution, printing or copying of the
information contained in this e-mail message
and/or attachments to it are strictly prohibited. If
you have received this communication in error,
please notify us by reply e-mail or telephone and
immediately and permanently delete the message
and any attachments. Thank you


Rafat Jahan <rafat.jahan@...>
 

Hi Dana,

We do not see any further dependency on BGPCEP project as of now.
But will request that BGPCEP remains as a part of offset 1 release in order to avoid any unforeseen issues.

Thanks and Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website:
http://www.tcs.com
____________________________________________
Experience certainty.        IT Services
                       Business Solutions
                       Consulting
____________________________________________




From:        "Dana Kutenicsova -X (dkutenic - Pantheon Technologies SRO at Cisco)" <dkutenic@...>
To:        Rafat Jahan <rafat.jahan@...>, "project-proposals@..." <project-proposals@...>
Cc:        "bgpcep-dev@..." <bgpcep-dev@...>
Date:        11/26/2014 02:43 PM
Subject:        RE: [Project-proposals] sdninterfaceapp(ODL-SDNi) project proposal for        Lithium Release-offset1




Hi,
does this mean that SDNi project will not be using BGPCEP project anymore?
We are claiming to be offset 1, but if the above is true, we switch to offset 2 (which means no project is dependent on us).
Regards,
Dana



From: project-proposals-bounces@... [project-proposals-bounces@...] on behalf of Rafat Jahan [rafat.jahan@...]
Sent:
Tuesday, November 25, 2014 8:12 AM
To:
project-proposals@...
Subject:
[Project-proposals] sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1


Dear All,

sdninterfaceapp project would like be a part of offset 1 Lithium release since our dependencies are only on controller and yang tools.

We have created a project release plan accordingly.
https://wiki.opendaylight.org/view/ODL-SDNi_App:Lithium_Release_Plan

Please let me know if there is anything else we need to do for sdninterfaceapp to be a part of Lithium Release. We are going through the link:  
https://wiki.opendaylight.org/view/Simultaneous_Release:Lithium_Release_Plan

During the Lithium code sprint we plan to complete the Phase 2 of Project scope which will be Quality Of Service Data. There will be some major structure refactoring, to reduce complexity and improve readability of the code. The RestAPI developed will undergo design change to make the API more robust in the data identification. The bugs identified in Helium will be updated with Lithium Release since they may require major anticipated code change.


Looking forward to your support and guidance.


Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website:
http://www.tcs.com
____________________________________________
Experience certainty.        IT Services
                      Business Solutions
                      Consulting
____________________________________________

=====-----=====-----=====
Notice: The information contained in this e-mail
message and/or attachments to it may contain
confidential or privileged information. If you are
not the intended recipient, any dissemination, use,
review, distribution, printing or copying of the
information contained in this e-mail message
and/or attachments to it are strictly prohibited. If
you have received this communication in error,
please notify us by reply e-mail or telephone and
immediately and permanently delete the message
and any attachments. Thank you


George Zhao
 

Thanks Rafat,

 

Yes, project lead role is selected by vote from committers in the project.  If your project only have one committer, then he/she will automatically be in the project lead role. We only need that in M1 milestone not immediately.

 

George

 

From: Rafat Jahan [mailto:rafat.jahan@...]
Sent: Tuesday, November 25, 2014 8:59 PM
To: George Zhao
Cc: Colin Dixon; project-proposals@...
Subject: RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1

 

Hi George,

Please find the contacts below.I will update this in the Release plan also.

Test Contact (email/IRC): Sushma Chakilela (sushma.chakilela@...)
Project Contact(email/IRC): Kiran Kotaru (kotaru.kiran@...)


We need a small clarification on Project Lead selection.Please correct me if I have misunderstood.
As per my understanding, the Project Lead will be elected and will be one from our end.For Helium, there was only one committer from our project which will increase for Lithium releases. Does that mean the Project Lead can be any one of the two ?

Thanks in advance.

Best Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website:
http://www.tcs.com
____________________________________________
Experience certainty.        IT Services
                       Business Solutions
                       Consulting
____________________________________________




From:        George Zhao <George.Y.Zhao@...>
To:        Rafat Jahan <rafat.jahan@...>, "project-proposals@..." <project-proposals@...>
Cc:        Colin Dixon <colin@...>
Date:        11/26/2014 07:49 AM
Subject:        RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1





Hi Rafat,
 
While you are on it, could you please provide the following information as well:
 
Test Contact (email/IRC)
Project Contact(email/IRC)
 
You may need to provide project lead (email/irc) once your project elect one in the future.
 
Thanks,
 
George
 
From: Rafat Jahan [mailto:rafat.jahan@...]
Sent:
Monday, November 24, 2014 11:12 PM
To:
project-proposals@...
Cc:
Colin Dixon; George Zhao
Subject:
sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1

 
Dear All,

sdninterfaceapp project would like be a part of offset 1 Lithium release since our dependencies are only on controller and yang tools.

We have created a project release plan accordingly.
https://wiki.opendaylight.org/view/ODL-SDNi_App:Lithium_Release_Plan

Please let me know if there is anything else we need to do for sdninterfaceapp to be a part of Lithium Release. We are going through the link:  
https://wiki.opendaylight.org/view/Simultaneous_Release:Lithium_Release_Plan

During the Lithium code sprint we plan to complete the Phase 2 of Project scope which will be Quality Of Service Data. There will be some major structure refactoring, to reduce complexity and improve readability of the code. The RestAPI developed will undergo design change to make the API more robust in the data identification. The bugs identified in Helium will be updated with Lithium Release since they may require major anticipated code change.


Looking forward to your support and guidance.


Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website:
http://www.tcs.com
____________________________________________
Experience certainty.        IT Services
                      Business Solutions
                      Consulting
____________________________________________

=====-----=====-----=====
Notice: The information contained in this e-mail
message and/or attachments to it may contain
confidential or privileged information. If you are
not the intended recipient, any dissemination, use,
review, distribution, printing or copying of the
information contained in this e-mail message
and/or attachments to it are strictly prohibited. If
you have received this communication in error,
please notify us by reply e-mail or telephone and
immediately and permanently delete the message
and any attachments. Thank you


Rafat Jahan <rafat.jahan@...>
 

Hi,

Can we get a spot on the TSC agenda on December 18th for the presentation and release review of sdninterfaceapp(ODL-SDNi) project.

Thanks and Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website:
http://www.tcs.com
____________________________________________
Experience certainty.        IT Services
                       Business Solutions
                       Consulting
____________________________________________




From:        George Zhao <George.Y.Zhao@...>
To:        Rafat Jahan <rafat.jahan@...>
Cc:        Colin Dixon <colin@...>, "project-proposals@..." <project-proposals@...>
Date:        11/27/2014 06:03 AM
Subject:        RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1




Thanks Rafat,
 
Yes, project lead role is selected by vote from committers in the project.  If your project only have one committer, then he/she will automatically be in the project lead role. We only need that in M1 milestone not immediately.
 
George
 

From: Rafat Jahan [mailto:rafat.jahan@...]
Sent:
Tuesday, November 25, 2014 8:59 PM
To:
George Zhao
Cc:
Colin Dixon; project-proposals@...
Subject:
RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1

 
Hi George,

Please find the contacts below.I will update this in the Release plan also.


Test Contact (email/IRC): Sushma Chakilela (sushma.chakilela@...)

Project Contact(email/IRC): Kiran Kotaru
(kotaru.kiran@...)



We need a small clarification on Project Lead selection.Please correct me if I have misunderstood.

As per my understanding, the Project Lead will be elected and will be one from our end.For Helium, there was only one committer from our project which will increase for Lithium releases. Does that mean the Project Lead can be any one of the two ?


Thanks in advance.


Best Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website:
http://www.tcs.com
____________________________________________
Experience certainty.        IT Services
                      Business Solutions
                      Consulting
____________________________________________




From:        
George Zhao <George.Y.Zhao@...>
To:        
Rafat Jahan <rafat.jahan@...>, "project-proposals@..." <project-proposals@...>
Cc:        
Colin Dixon <colin@...>
Date:        
11/26/2014 07:49 AM
Subject:        
RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1






Hi Rafat,

 
While you are on it, could you please provide the following information as well:

 
Test Contact (email/IRC)

Project Contact(email/IRC)

 
You may need to provide project lead (email/irc) once your project elect one in the future.

 
Thanks,

 
George

 
From:
Rafat Jahan [
mailto:rafat.jahan@...]
Sent:
Monday, November 24, 2014 11:12 PM
To:
project-proposals@...
Cc:
Colin Dixon; George Zhao
Subject:
sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1

 

Dear All,


sdninterfaceapp project would like be a part of offset 1 Lithium release since our dependencies are only on controller and yang tools.

We have created a project release plan accordingly.
https://wiki.opendaylight.org/view/ODL-SDNi_App:Lithium_Release_Plan

Please let me know if there is anything else we need to do for sdninterfaceapp to be a part of Lithium Release. We are going through the link:  
https://wiki.opendaylight.org/view/Simultaneous_Release:Lithium_Release_Plan

During the Lithium code sprint we plan to complete the Phase 2 of Project scope which will be Quality Of Service Data. There will be some major structure refactoring, to reduce complexity and improve readability of the code. The RestAPI developed will undergo design change to make the API more robust in the data identification. The bugs identified in Helium will be updated with Lithium Release since they may require major anticipated code change.


Looking forward to your support and guidance.


Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website:
http://www.tcs.com
____________________________________________
Experience certainty.        IT Services
                     Business Solutions
                     Consulting
____________________________________________

=====-----=====-----=====
Notice: The information contained in this e-mail
message and/or attachments to it may contain
confidential or privileged information. If you are
not the intended recipient, any dissemination, use,
review, distribution, printing or copying of the
information contained in this e-mail message
and/or attachments to it are strictly prohibited. If
you have received this communication in error,
please notify us by reply e-mail or telephone and
immediately and permanently delete the message
and any attachments. Thank you


George Zhao
 

SDNi is an existing project.

 

Please verify with Colin, I thought existing projects should submit to release mailing list instead of proposal to indicate intention to participate Lithium SR with M1 information:

 

1)      Offset

2)      Project Lead, Project Contact, Test Contact

3)      Published release plan

 

Thanks,

 

George

 

 

 

From: Rafat Jahan [mailto:rafat.jahan@...]
Sent: Monday, December 08, 2014 12:32 PM
To: George Zhao
Cc: Colin Dixon; project-proposals@...
Subject: RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1

 

Hi,

Can we get a spot on the TSC agenda on December 18th for the presentation and release review of sdninterfaceapp(ODL-SDNi) project.

Thanks and Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website:
http://www.tcs.com
____________________________________________
Experience certainty.        IT Services
                       Business Solutions
                       Consulting
____________________________________________




From:        George Zhao <George.Y.Zhao@...>
To:        Rafat Jahan <rafat.jahan@...>
Cc:        Colin Dixon <colin@...>, "project-proposals@..." <project-proposals@...>
Date:        11/27/2014 06:03 AM
Subject:        RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1





Thanks Rafat,
 
Yes, project lead role is selected by vote from committers in the project.  If your project only have one committer, then he/she will automatically be in the project lead role. We only need that in M1 milestone not immediately.
 
George
 
From: Rafat Jahan [mailto:rafat.jahan@...]
Sent:
Tuesday, November 25, 2014 8:59 PM
To:
George Zhao
Cc:
Colin Dixon; project-proposals@...
Subject:
RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1

 
Hi George,

Please find the contacts below.I will update this in the Release plan also.


Test Contact (email/IRC): Sushma Chakilela (sushma.chakilela@...)

Project Contact(email/IRC): Kiran Kotaru
(kotaru.kiran@...)



We need a small clarification on Project Lead selection.Please correct me if I have misunderstood.

As per my understanding, the Project Lead will be elected and will be one from our end.For Helium, there was only one committer from our project which will increase for Lithium releases. Does that mean the Project Lead can be any one of the two ?


Thanks in advance.


Best Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website:
http://www.tcs.com
____________________________________________
Experience certainty.        IT Services
                      Business Solutions
                      Consulting
____________________________________________




From:        
George Zhao <George.Y.Zhao@...>
To:        
Rafat Jahan <rafat.jahan@...>, "project-proposals@..." <project-proposals@...>
Cc:        
Colin Dixon <colin@...>
Date:        
11/26/2014 07:49 AM
Subject:        
RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1






Hi Rafat,

 
While you are on it, could you please provide the following information as well:

 
Test Contact (email/IRC)

Project Contact(email/IRC)

 
You may need to provide project lead (email/irc) once your project elect one in the future.

 
Thanks,

 
George

 
From:
Rafat Jahan [mailto:rafat.jahan@...]
Sent:
Monday, November 24, 2014 11:12 PM
To:
project-proposals@...
Cc:
Colin Dixon; George Zhao
Subject:
sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1

 
Dear All,


sdninterfaceapp project would like be a part of offset 1 Lithium release since our dependencies are only on controller and yang tools.

We have created a project release plan accordingly.
https://wiki.opendaylight.org/view/ODL-SDNi_App:Lithium_Release_Plan

Please let me know if there is anything else we need to do for sdninterfaceapp to be a part of Lithium Release. We are going through the link:  
https://wiki.opendaylight.org/view/Simultaneous_Release:Lithium_Release_Plan

During the Lithium code sprint we plan to complete the Phase 2 of Project scope which will be Quality Of Service Data. There will be some major structure refactoring, to reduce complexity and improve readability of the code. The RestAPI developed will undergo design change to make the API more robust in the data identification. The bugs identified in Helium will be updated with Lithium Release since they may require major anticipated code change.


Looking forward to your support and guidance.


Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website:
http://www.tcs.com
____________________________________________
Experience certainty.        IT Services
                     Business Solutions
                     Consulting
____________________________________________

=====-----=====-----=====
Notice: The information contained in this e-mail
message and/or attachments to it may contain
confidential or privileged information. If you are
not the intended recipient, any dissemination, use,
review, distribution, printing or copying of the
information contained in this e-mail message
and/or attachments to it are strictly prohibited. If
you have received this communication in error,
please notify us by reply e-mail or telephone and
immediately and permanently delete the message
and any attachments. Thank you


Colin Dixon
 

George is right. Existing projects should e-mail the release list (release@...) with the George listed. Existing projects DO NOT need to have another creation review to participate.

--Colin


On Mon, Dec 8, 2014 at 3:27 PM, George Zhao <George.Y.Zhao@...> wrote:

SDNi is an existing project.

 

Please verify with Colin, I thought existing projects should submit to release mailing list instead of proposal to indicate intention to participate Lithium SR with M1 information:

 

1)      Offset

2)      Project Lead, Project Contact, Test Contact

3)      Published release plan

 

Thanks,

 

George

 

 

 

From: Rafat Jahan [mailto:rafat.jahan@...]
Sent: Monday, December 08, 2014 12:32 PM


To: George Zhao
Cc: Colin Dixon; project-proposals@...
Subject: RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1

 

Hi,

Can we get a spot on the TSC agenda on December 18th for the presentation and release review of sdninterfaceapp(ODL-SDNi) project.

Thanks and Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website:
http://www.tcs.com
____________________________________________
Experience certainty.        IT Services
                       Business Solutions
                       Consulting
____________________________________________




From:        George Zhao <George.Y.Zhao@...>
To:        Rafat Jahan <rafat.jahan@...>
Cc:        Colin Dixon <colin@...>, "project-proposals@..." <project-proposals@...>
Date:        11/27/2014 06:03 AM
Subject:        RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1





Thanks Rafat,
 
Yes, project lead role is selected by vote from committers in the project.  If your project only have one committer, then he/she will automatically be in the project lead role. We only need that in M1 milestone not immediately.
 
George
 
From: Rafat Jahan [mailto:rafat.jahan@...]
Sent:
Tuesday, November 25, 2014 8:59 PM
To:
George Zhao
Cc:
Colin Dixon; project-proposals@...
Subject:
RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1

 
Hi George,

Please find the contacts below.I will update this in the Release plan also.


Test Contact (email/IRC): Sushma Chakilela (sushma.chakilela@...)

Project Contact(email/IRC): Kiran Kotaru
(kotaru.kiran@...)



We need a small clarification on Project Lead selection.Please correct me if I have misunderstood.

As per my understanding, the Project Lead will be elected and will be one from our end.For Helium, there was only one committer from our project which will increase for Lithium releases. Does that mean the Project Lead can be any one of the two ?


Thanks in advance.


Best Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website:
http://www.tcs.com
____________________________________________
Experience certainty.        IT Services
                      Business Solutions
                      Consulting
____________________________________________




From:        
George Zhao <George.Y.Zhao@...>
To:        
Rafat Jahan <rafat.jahan@...>, "project-proposals@..." <project-proposals@...>
Cc:        
Colin Dixon <colin@...>
Date:        
11/26/2014 07:49 AM
Subject:        
RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1






Hi Rafat,

 
While you are on it, could you please provide the following information as well:

 
Test Contact (email/IRC)

Project Contact(email/IRC)

 
You may need to provide project lead (email/irc) once your project elect one in the future.

 
Thanks,

 
George

 
From:
Rafat Jahan [mailto:rafat.jahan@...]
Sent:
Monday, November 24, 2014 11:12 PM
To:
project-proposals@...
Cc:
Colin Dixon; George Zhao
Subject:
sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1

 
Dear All,


sdninterfaceapp project would like be a part of offset 1 Lithium release since our dependencies are only on controller and yang tools.

We have created a project release plan accordingly.
https://wiki.opendaylight.org/view/ODL-SDNi_App:Lithium_Release_Plan

Please let me know if there is anything else we need to do for sdninterfaceapp to be a part of Lithium Release. We are going through the link:  
https://wiki.opendaylight.org/view/Simultaneous_Release:Lithium_Release_Plan

During the Lithium code sprint we plan to complete the Phase 2 of Project scope which will be Quality Of Service Data. There will be some major structure refactoring, to reduce complexity and improve readability of the code. The RestAPI developed will undergo design change to make the API more robust in the data identification. The bugs identified in Helium will be updated with Lithium Release since they may require major anticipated code change.


Looking forward to your support and guidance.


Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website:
http://www.tcs.com
____________________________________________
Experience certainty.        IT Services
                     Business Solutions
                     Consulting
____________________________________________

=====-----=====-----=====
Notice: The information contained in this e-mail
message and/or attachments to it may contain
confidential or privileged information. If you are
not the intended recipient, any dissemination, use,
review, distribution, printing or copying of the
information contained in this e-mail message
and/or attachments to it are strictly prohibited. If
you have received this communication in error,
please notify us by reply e-mail or telephone and
immediately and permanently delete the message
and any attachments. Thank you



Rafat Jahan <rafat.jahan@...>
 

Hi George/Colin,

Thank you for the information. Will do as mentioned.

Best Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________

-----Colin Dixon <colin@...> wrote: -----

=======================
To: George Zhao <George.Y.Zhao@...>
From: Colin Dixon <colin@...>
Date: 12/10/2014 09:37AM
Cc: Rafat Jahan <rafat.jahan@...>, "project-proposals@..." <project-proposals@...>
Subject: Re: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
=======================
George is right. Existing projects should e-mail the release list (
release@...) with the George listed. Existing projects
DO NOT need to have another creation review to participate.

--Colin


On Mon, Dec 8, 2014 at 3:27 PM, George Zhao <George.Y.Zhao@...>
wrote:

SDNi is an existing project.



Please verify with Colin, I thought existing projects should submit to
release mailing list instead of proposal to indicate intention to
participate Lithium SR with M1 information:



1) Offset

2) Project Lead, Project Contact, Test Contact

3) Published release plan



Thanks,



George







*From:* Rafat Jahan [mailto:rafat.jahan@...]
*Sent:* Monday, December 08, 2014 12:32 PM

*To:* George Zhao
*Cc:* Colin Dixon; project-proposals@...
*Subject:* RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium
Release-offset1



Hi,

Can we get a spot on the TSC agenda on December 18th for the presentation
and release review of sdninterfaceapp(ODL-SDNi) project.

Thanks and Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________



From: George Zhao <George.Y.Zhao@...>
To: Rafat Jahan <rafat.jahan@...>
Cc: Colin Dixon <colin@...>, "
project-proposals@..." <
project-proposals@...>
Date: 11/27/2014 06:03 AM
Subject: RE: sdninterfaceapp(ODL-SDNi) project proposal for
Lithium Release-offset1
------------------------------




Thanks Rafat,

Yes, project lead role is selected by vote from committers in the
project. If your project only have one committer, then he/she will
automatically be in the project lead role. We only need that in M1
milestone not immediately.

George

*From:* Rafat Jahan [mailto:rafat.jahan@... <rafat.jahan@...>]
* Sent:* Tuesday, November 25, 2014 8:59 PM
* To:* George Zhao
* Cc:* Colin Dixon; project-proposals@...
* Subject:* RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium
Release-offset1

Hi George,

Please find the contacts below.I will update this in the Release plan also.

Test Contact (email/IRC): Sushma Chakilela (sushma.chakilela@...)
Project Contact(email/IRC): Kiran Kotaru (kotaru.kiran@...)



We need a small clarification on Project Lead selection.Please correct me
if I have misunderstood.
As per my understanding, the Project Lead will be elected and will be one
from our end.For Helium, there was only one committer from our project
which will increase for Lithium releases. Does that mean the Project Lead
can be any one of the two ?

Thanks in advance.

Best Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________



From: George Zhao <George.Y.Zhao@...>
To: Rafat Jahan <rafat.jahan@...>, "
project-proposals@..." <
project-proposals@...>
Cc: Colin Dixon <colin@...>
Date: 11/26/2014 07:49 AM
Subject: RE: sdninterfaceapp(ODL-SDNi) project proposal for
Lithium Release-offset1
------------------------------





Hi Rafat,

While you are on it, could you please provide the following information as
well:

Test Contact (email/IRC)
Project Contact(email/IRC)

You may need to provide project lead (email/irc) once your project elect
one in the future.

Thanks,

George

* From:* Rafat Jahan [mailto:rafat.jahan@... <rafat.jahan@...>]
* Sent:* Monday, November 24, 2014 11:12 PM
* To:* project-proposals@...
* Cc:* Colin Dixon; George Zhao
* Subject:* sdninterfaceapp(ODL-SDNi) project proposal for Lithium
Release-offset1

Dear All,

sdninterfaceapp project would like be a part of offset 1 Lithium release
since our dependencies are only on controller and yang tools.
We have created a project release plan accordingly.
https://wiki.opendaylight.org/view/ODL-SDNi_App:Lithium_Release_Plan

Please let me know if there is anything else we need to do for
sdninterfaceapp to be a part of Lithium Release. We are going through the
link:
https://wiki.opendaylight.org/view/Simultaneous_Release:Lithium_Release_Plan

During the Lithium code sprint we plan to complete the Phase 2 of Project
scope which will be Quality Of Service Data. There will be some major
structure refactoring, to reduce complexity and improve readability of the
code. The RestAPI developed will undergo design change to make the API more
robust in the data identification. The bugs identified in Helium will be
updated with Lithium Release since they may require major anticipated code
change.

Looking forward to your support and guidance.

Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________

=====-----=====-----=====
Notice: The information contained in this e-mail
message and/or attachments to it may contain
confidential or privileged information. If you are
not the intended recipient, any dissemination, use,
review, distribution, printing or copying of the
information contained in this e-mail message
and/or attachments to it are strictly prohibited. If
you have received this communication in error,
please notify us by reply e-mail or telephone and
immediately and permanently delete the message
and any attachments. Thank you


Rafat Jahan <rafat.jahan@...>
 

Hi George/Colin,

Thank you for the information. Will do as mentioned.

Best Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________

-----Colin Dixon <colin@...> wrote: -----

=======================
To: George Zhao <George.Y.Zhao@...>
From: Colin Dixon <colin@...>
Date: 12/10/2014 09:37AM
Cc: Rafat Jahan <rafat.jahan@...>, "project-proposals@..." <project-proposals@...>
Subject: Re: sdninterfaceapp(ODL-SDNi) project proposal for Lithium Release-offset1
=======================
George is right. Existing projects should e-mail the release list (
release@...) with the George listed. Existing projects
DO NOT need to have another creation review to participate.

--Colin


On Mon, Dec 8, 2014 at 3:27 PM, George Zhao <George.Y.Zhao@...>
wrote:

SDNi is an existing project.



Please verify with Colin, I thought existing projects should submit to
release mailing list instead of proposal to indicate intention to
participate Lithium SR with M1 information:



1) Offset

2) Project Lead, Project Contact, Test Contact

3) Published release plan



Thanks,



George







*From:* Rafat Jahan [mailto:rafat.jahan@...]
*Sent:* Monday, December 08, 2014 12:32 PM

*To:* George Zhao
*Cc:* Colin Dixon; project-proposals@...
*Subject:* RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium
Release-offset1



Hi,

Can we get a spot on the TSC agenda on December 18th for the presentation
and release review of sdninterfaceapp(ODL-SDNi) project.

Thanks and Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________



From: George Zhao <George.Y.Zhao@...>
To: Rafat Jahan <rafat.jahan@...>
Cc: Colin Dixon <colin@...>, "
project-proposals@..." <
project-proposals@...>
Date: 11/27/2014 06:03 AM
Subject: RE: sdninterfaceapp(ODL-SDNi) project proposal for
Lithium Release-offset1
------------------------------




Thanks Rafat,

Yes, project lead role is selected by vote from committers in the
project. If your project only have one committer, then he/she will
automatically be in the project lead role. We only need that in M1
milestone not immediately.

George

*From:* Rafat Jahan [mailto:rafat.jahan@... <rafat.jahan@...>]
* Sent:* Tuesday, November 25, 2014 8:59 PM
* To:* George Zhao
* Cc:* Colin Dixon; project-proposals@...
* Subject:* RE: sdninterfaceapp(ODL-SDNi) project proposal for Lithium
Release-offset1

Hi George,

Please find the contacts below.I will update this in the Release plan also.

Test Contact (email/IRC): Sushma Chakilela (sushma.chakilela@...)
Project Contact(email/IRC): Kiran Kotaru (kotaru.kiran@...)



We need a small clarification on Project Lead selection.Please correct me
if I have misunderstood.
As per my understanding, the Project Lead will be elected and will be one
from our end.For Helium, there was only one committer from our project
which will increase for Lithium releases. Does that mean the Project Lead
can be any one of the two ?

Thanks in advance.

Best Regards,
Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________



From: George Zhao <George.Y.Zhao@...>
To: Rafat Jahan <rafat.jahan@...>, "
project-proposals@..." <
project-proposals@...>
Cc: Colin Dixon <colin@...>
Date: 11/26/2014 07:49 AM
Subject: RE: sdninterfaceapp(ODL-SDNi) project proposal for
Lithium Release-offset1
------------------------------





Hi Rafat,

While you are on it, could you please provide the following information as
well:

Test Contact (email/IRC)
Project Contact(email/IRC)

You may need to provide project lead (email/irc) once your project elect
one in the future.

Thanks,

George

* From:* Rafat Jahan [mailto:rafat.jahan@... <rafat.jahan@...>]
* Sent:* Monday, November 24, 2014 11:12 PM
* To:* project-proposals@...
* Cc:* Colin Dixon; George Zhao
* Subject:* sdninterfaceapp(ODL-SDNi) project proposal for Lithium
Release-offset1

Dear All,

sdninterfaceapp project would like be a part of offset 1 Lithium release
since our dependencies are only on controller and yang tools.
We have created a project release plan accordingly.
https://wiki.opendaylight.org/view/ODL-SDNi_App:Lithium_Release_Plan

Please let me know if there is anything else we need to do for
sdninterfaceapp to be a part of Lithium Release. We are going through the
link:
https://wiki.opendaylight.org/view/Simultaneous_Release:Lithium_Release_Plan

During the Lithium code sprint we plan to complete the Phase 2 of Project
scope which will be Quality Of Service Data. There will be some major
structure refactoring, to reduce complexity and improve readability of the
code. The RestAPI developed will undergo design change to make the API more
robust in the data identification. The bugs identified in Helium will be
updated with Lithium Release since they may require major anticipated code
change.

Looking forward to your support and guidance.

Rafat Jahan
Tata Consultancy Services
Cell:- 9886420332
Mailto: rafat.jahan@...
Website: http://www.tcs.com
____________________________________________
Experience certainty. IT Services
Business Solutions
Consulting
____________________________________________

=====-----=====-----=====
Notice: The information contained in this e-mail
message and/or attachments to it may contain
confidential or privileged information. If you are
not the intended recipient, any dissemination, use,
review, distribution, printing or copying of the
information contained in this e-mail message
and/or attachments to it are strictly prohibited. If
you have received this communication in error,
please notify us by reply e-mail or telephone and
immediately and permanently delete the message
and any attachments. Thank you