This group is locked. No changes can be made to the group while it is locked.
Date
1 - 2 of 2
ALTO M4 Status
Jensen Zhang
ALTO M4 Status
1. Please provide updates on any previously-incomplete items from prior milestone readouts. N/A 2. Has your project achieved API freeze, i.e., all externally accessible APIs [Stable and Provisional] will not be modified after now? Yes/No Yes * Provide a link to a gerrit search for patches modifying the files defined as specifying the API. Example [1]. https://git.opendaylight.org/gerrit/#/q/file:%255Ealto-core/standard-service-models/model-base/.%252B+project:alto 3. What are the current word counts (total and per-document) for your project? * word count User Guide - 662 Developer Guide - 635 * links to gerrit patches or links to the file in git as appropriate https://git.opendaylight.org/gerrit/gitweb?p=docs.git;a=tree;f=manuals/user-guide/src/main/asciidoc/alto;h=1cd5c7ad2fd88aa1e9792cdd6a105183d8b72e85;hb=HEAD https://git.opendaylight.org/gerrit/gitweb?p=docs.git;a=tree;f=manuals/developer-guide/src/main/asciidoc/alto;h=8d1008372662a4aa2a4b280b9e14dee0c121fd90;hb=HEAD 4. Has your project met the requirements to be included in Maven Central [2]? Yes/No Yes, except GPG signing. 5. Were there any project-specific deliverables planned for this milestone? Yes/No No 6. Have you started automated system testing for your top-level features. Yes/No No, waiting to be merged. Patch Link: https://git.opendaylight.org/gerrit/#/c/30553/ * If yes, link to test report Not yet completed. We are working on this. 7. Have you updated the wiki [3] with any ports used, including for testing? Yes. 8. Does your project build successful in Beryllium Autorelease [4]? Yes/No Yes 9. Does your project build with Java 8? Yes * Link to jdk8 verify job https://jenkins.opendaylight.org/releng/view/alto/job/alto-verify-beryllium/jdk=openjdk8,nodes=dynamic_verify/ Jensen |
|
Gao Kai
Thanks for the work!
toggle quoted message
Show quoted text
On 04/12/15 11:21, Jensen Zhang wrote:
|
|